Platform engineering
Extraction
Subsystems
Pit and bench geometry
Reference approved surfaces, bench boundaries, access routes, and revisions.
Short-interval planning
Map shift priorities, dig units, and planned ore or waste destinations to the relevant model snapshot.
Execution history
Record progress and approved work events alongside surveyed actuals and reasons for variance.
Inputs and interfaces
Approved design and schedule, block-model snapshot, survey observations, and shift logs.
Outputs and engineering use
Plan-versus-actual view with traceable changes in area, material class, and destination.