Platform engineering
Shared data and reconciliation
Subsystems
Plan to load
Compare the planned source and estimated grade with recorded dig location, load, and destination.
Load to plant
Follow transfer events through stockpile receipts and withdrawals into measured plant feed.
Variance and corrections
Record missing events, inventory changes, moisture basis differences, and approved corrections with their origin.
Inputs and interfaces
Resource estimates, dispatch and survey records, stockpile ledger, scale data, and plant balance.
Outputs and engineering use
Traceable plan-to-product comparison and a review queue for unexplained discrepancies.