
Engineering guidance. Examples and proposed workflows are illustrative.
Keep the planned origin
Record the model version and source location used to assign the planned material class. When a load is created, retain its observed origin and destination so later adjustments can be reconstructed.
Represent stockpiles as inventories
Stockpiles receive and release material over time. The digital record should show transfers, blend assumptions, survey adjustments, and uncertainty. Keep estimated grade separate from the assay used to assess it.
Reconcile the plant boundary
Compare tonnes on the same wet or dry basis and for a consistent window. Line up feed, product, tailings, and inventory changes. A balance gap is a starting point for checking metering, sampling, timing, or unrecorded transfers.
Start with one route
Choose a source zone, one stockpile, and one plant feed point. Review a complete shift with operations and lab staff before expanding the scope. Document the correction workflow so the same event is not silently counted twice.
